The long-stan­ding Pedia­tric Inten­si­ve Care Unit (PICU) at the Orot­ta Hos­pi­tal in Asma­ra, Eritrea, was in urgent need of reno­va­ti­on. The con­di­ti­on and equip­ment of the inten­si­ve care unit were dis­as­trous: the water sup­p­ly con­sis­ted mere­ly of a sin­gle bar­rel, which was a con­stant source of mas­si­ve hygie­ne pro­blems. Ano­ther major short­co­ming was the power sup­p­ly, as the PICU had elec­tri­ci­ty for only a few hours a day, if at all. Child­ren could not be moni­to­red con­ti­nuous­ly, posing a life-threa­tening risk if cri­ti­cal situa­tions were not detec­ted in time. Fur­ther­mo­re, the sen­si­ti­ve tech­no­lo­gy is not desi­gned for power fluc­tua­tions or abrupt power outa­ges, caus­ing new­ly acqui­red moni­to­ring screens to break repea­ted­ly. Oxy­gen and com­pres­sed air sup­pli­es, which are stan­dard in Ger­man inten­si­ve care units for ven­ti­la­ti­on and inha­la­ti­on the­ra­pies, were non-exis­tent.

Archemed Renovation Pediatric Intensive Care Unit PICU
read more

ARCHEMED has tur­ned all of this into rea­li­ty. After six years of plan­ning and construction—largely due to the long break cau­sed by the pandemic—the PICU was ope­ned in April 2024. Through num­e­rous deploy­ments of skil­led trade­speo­p­le and in coope­ra­ti­on with Eri­tre­an hel­pers, five bro­ken and com­ple­te­ly gut­ted rooms have been trans­for­med into a pedia­tric inten­si­ve care unit of Euro­pean stan­dard. After various struc­tu­ral works such as wall breakth­roughs and the instal­la­ti­on of dry­wall were com­ple­ted, all pipes and cables were re-laid behind plas­ter, sani­ta­ry faci­li­ties were rene­wed, and modern elec­tri­cal instal­la­ti­ons were fit­ted. Win­dows and doors were new­ly instal­led, appro­pria­te light­ing was added, and til­ing and pain­ting work was finis­hed. Oxy­gen and com­pres­sed air were instal­led so that the tech­ni­cal requi­re­ments for ven­ti­la­ti­on are now met at each of the 12 pati­ent beds. Final­ly, the ward was equip­ped with fur­ni­tu­re and the neces­sa­ry medi­cal tech­no­lo­gy.

The pro­ject was com­ple­ted in April 2024.

Pro­ject Manage­ment

Nor­bert Kess­ler, Civil Engi­neer, Hös­bach