loader image

The lar­gest and most important neo­na­tal and pre­ma­tu­re infant unit in Eritrea, loca­ted in the capi­tal Asma­ra, tre­ats up to 1,800 cri­ti­cal­ly ill infants annu­al­ly. Per­ma­nent­ly over­c­row­ded, the reno­va­ti­on of this now over 20-year-old unit is urgen­tly requi­red. While instal­ling new sup­p­ly rails, our craft­smen dis­co­ver­ed a major ter­mi­te infe­sta­ti­on in the par­ti­ti­on walls of the infant rooms. This is an untenable situa­ti­on for the ope­ra­ti­on of a neo­na­tal unit whe­re pati­ents requi­re a par­ti­cu­lar­ly high level of medi­cal care and hygie­ne.

The unit will now be com­ple­te­ly gut­ted, all pests eli­mi­na­ted, and the walls reno­va­ted. For this exten­si­ve reno­va­ti­on pro­ject, the infants must first be evacua­ted. To accom­mo­da­te the new­borns, we are using the neigh­bor­ing sur­gi­cal cen­ter IOC­CA, which will unfort­u­na­te­ly not be available for ARCHEMED sur­gi­cal ope­ra­ti­ons during the enti­re peri­od of the work. Howe­ver, ade­qua­te care is available the­re, ensu­ring no gap in the spe­cia­li­zed care and tre­at­ment of the small pati­ents.

Archemed Renovation Neo Asmara
read more

Start­ing in Decem­ber 2024, num­e­rous ARCHEMED craft­smen will car­ry out the reno­va­ti­on of the inte­ri­or spaces tog­e­ther with their Eri­tre­an col­le­agues. This requi­res pre­cise coor­di­na­ti­on and bin­ding agree­ments bet­ween the indi­vi­du­al trades to ensu­re the pro­ject pro­ceeds smooth­ly. All con­tai­ners with buil­ding mate­ri­als are alre­a­dy on their way to Asma­ra so that the requi­red mate­ri­als are on site when the work beg­ins.

The res­to­red neo­na­tal unit will then be equip­ped with new warm­ing beds and modern medi­cal tech­no­lo­gy. We expect the reno­va­ti­on work to be com­ple­ted in April 2025. The infants will then be trans­fer­red back and sur­gi­cal ope­ra­ti­ons at IOC­CA will resu­me.

Pro­ject Manage­ment

Nor­bert Kess­ler, Civil Engi­neer, Hös­bach